2КТПСП-1000/10 and two 2КТПУБ-1600/10 was shipped to JSC “Belgorkhimprom” for a mining and processing integrated plant building in the potash salt mine field in Garlyk, Lebap District, Turkmenistan.
- News |
- FAQ |
- Media library
2КТПСП-1000/10 and two 2КТПУБ-1600/10 was shipped to JSC “Belgorkhimprom” for a mining and processing integrated plant building in the potash salt mine field in Garlyk, Lebap District, Turkmenistan.
06 december 2013